Who It's For / Underground Utility

Wet utility work lives or dies on documentation

Water, sewer, and storm work generates more compliance records per foot than almost anything else in civil. PM Axsus captures those records at the trench, tied to the same data that produces your cost and schedule picture.

Underground utility contractors run two jobs at once. There is the job of installing pipe, and there is the job of proving the pipe was installed correctly. The second one is invisible in the bid and enormous in practice, and it is almost entirely a data problem.

The day, as it actually runs

A mainline crew is laying 400 feet of eight-inch. Bedding gets placed, pipe gets laid, joints get made, backfill goes in lifts. Density gets tested on those lifts. Somewhere behind them, services are being tapped and a separate record is being generated for each one. Ahead of them, potholing found a gas line eighteen inches off from the plans, which is now a differing site condition that somebody will want documented. At the end of the run there is a pressure test, and eventually a vacuum test on the structures.

Each of those is a record with an owner, an inspector, and a required format. Miss one and the section does not get accepted. Misplace one and you are excavating to prove something you already know is true.

You are not paid when the pipe is in the ground. You are paid when the record says the pipe is in the ground correctly.

What hurts most

How the platform fits a utility operation

PM Axsus captures compaction and pressure test records in structured form, in the field, with photos, signatures, and timestamps attached, and supports branded PDF delivery to inspectors. Time is captured with GPS-tagged clock in and out against the project and the work being performed, with the daily hazard acknowledgment integrated at clock-in. Installed quantities, including each-count items like services and structures, are logged against pay items as they go in. Material deliveries are recorded with photos when the truck arrives, and procurement requests are tracked to the project.

Because compliance capture and production capture are the same act, the compliance burden stops being pure overhead. The records that satisfy the inspector are the same records that produce live earned value, so the documentation work now pays for itself twice. There is also a read-only client portal for owners and municipalities that shows progress and inspection media without exposing internal cost data.

What changes in the first month

  1. The inspector relationship shifts. Documentation that arrives complete and formatted the same way every time buys goodwill you cannot get any other way.
  2. Test records stop going missing. Because they are created at the trench rather than transcribed later.
  3. Closeout gets shorter. The package accumulates during the job instead of being reconstructed after it.

Where to start

For utility contractors the highest-return entry points are compaction tracking and inspection capture, because the re-inspection cost is immediate and measurable. From there, quantity tracking and earned value management turn the same captured data into cost and schedule insight.

Common questions

Does it handle each-count items like services and structures?

Each-counts are quantities like any other and are captured against their pay item as they are installed. On jobs with hundreds of small items, capturing them as they happen is the difference between a countable record and a weekly spreadsheet reconstruction.

Can our municipality or owner see the inspection records?

There is a read-only client portal for owners and municipalities showing progress and inspection media without exposing internal cost data. What you share is your decision.

Will it produce the exact test report format our agency requires?

Agency formats vary and no vendor should promise this sight unseen. Bring your required forms to a demo and check the fit directly. What the platform provides is complete, timestamped, attributable records with photos and signatures, which is the substance behind any required format.

Bring the last re-inspection that cost you a day

Thirty minutes, your job structure, your pay items. Or start with our free traffic control plan builder.