Who It's For / Sitework

Many pay items, many crews, one live picture

Sitework is not one job. It is fifteen small jobs running at different speeds on the same parcel. PM Axsus keeps quantities and hours attached to the right item at the point of installation, so the whole thing resolves into one number you can trust.

The defining problem of sitework is not difficulty. It is breadth. Clearing, mass grading, storm, sanitary, water, subgrade, base, curb, flatwork, and landscape can all be live in the same month, on the same site, with crews moving between them. Each has its own pay items, its own production rate, and its own way of going wrong.

The day, as it actually runs

Three crews on site. One is finishing storm on the north end. One is proof-rolling subgrade in the parking field. One is chasing curb ahead of the concrete sub who shows up Thursday whether you are ready or not. The dozer operator spent the morning on mass grading and the afternoon shaping a pond. Two loads of base showed up and one got rejected. The GC's super wants to know if you will be ready for asphalt on the 14th.

All of that has to end up correctly allocated to a dozen different cost codes. In practice, it usually does not.

On sitework, the job total almost always looks fine. It is the item-level detail that is bleeding, and it hides inside the total until the last month.

What hurts most

How the platform fits a sitework operation

The core move is that hours and quantities carry item-level context at the moment they are captured. Time is recorded with GPS-tagged clock in and out against the project and the work being performed, so a crew that moves between activities can be reflected accurately instead of averaged. Installed quantities are logged against their pay items as work goes in. Compaction and pressure tests are captured in structured form with photos and signatures at the location. Material deliveries are logged with photos when they arrive, and equipment assignments are tracked against the fleet.

With that context intact, the office gets earned value by item rather than only by job, which is the resolution sitework actually needs. The Axsus Intelligence OS layer reads the same verified record and surfaces which items are diverging from plan, which is exactly the question a job total cannot answer.

What changes in the first month

  1. Problem items surface individually. Not in the last month, when the only remaining option is to eat it.
  2. Schedule answers get faster. When the GC asks about the 14th, the answer comes from a record rather than a round of calls.
  3. Crew moves get cheaper. Reallocating a crew mid-week stops corrupting the cost data, because the hours follow the work.

Where to start

Sitework contractors usually get the fastest return from time tracking, because cross-coded hours are the largest single source of bad item-level data. Pair it with quantity tracking and the earned value picture becomes trustworthy at the item level. Daily reports then assemble themselves from what was already captured.

Common questions

Can one person be on multiple cost codes in a day?

That is the normal case on sitework and it is exactly what item-level capture is for. Capturing the work being performed at the time is what prevents a whole day from collapsing onto one code.

We self-perform some scopes and sub out others. Does that matter?

The platform tracks your self-performed field work in detail. Subcontracted scope shows up as cost and schedule dependency rather than as field capture, since you are not the one installing it. Bring your typical scope split to a demo.

How granular should our cost codes be?

Granular enough that a code corresponds to work a crew can actually be doing for a stretch of time, and no more. Codes finer than that get ignored by foremen, which produces worse data than a coarser structure that people follow.

Find the bleeding item before the last month

Thirty minutes, your job structure, your pay items. Or start with our free traffic control plan builder.