Stop losing money
you already earned.
PM Axsus is a field-first Earned Value Management system built by contractors for contractors. Production, time, safety, inspections, and testing - logged in real time, tied directly to progress and cost.
Watch PM Axsus in the field.
A quick look at how the platform captures work at the point of installation.
PM Axsus Field: daily reports and inspections, free.
Your crew fills out the day's report or a checklist inspection on the phone, attaches photos, signs it, and sends a branded PDF to the project manager - with no signal and no account needed. It is free on iOS and Android, and it keeps working whether or not your company ever buys the platform.
Civil construction runs on paper, texts, and guesswork.
Most field data gets reconstructed in the office - hours after the work happened, from memory, texts, and paper logs. By then it's already wrong. Inspections fail. Disputes cost money. Time disappears into paperwork.
The result: crews working, but nothing being captured. Revenue earned, but proof lost.
"If it isn't captured when the work happens, it doesn't exist."
— PM AxsusFailed Inspections
Missing compaction reports and pressure test documentation cause re-inspections that cost more than a year of software.
Time Card Chaos
Crews submit hours from memory on Fridays. Payroll disputes eat hours of admin time every week.
Fragmented Systems
Five apps doing five things, none of them talking to each other. Data lives in texts, emails, and spreadsheets.
Invisible Cost Bleed
No real-time visibility into where the budget is going until it's already gone and the job is in trouble.
Zero Field Visibility
Owners and PMs flying blind on production, equipment, and crew status until someone makes a call.
Every workflow. One system.
Built from real field operations. Every module solves a specific pain point contractors face daily.
Earned Value Management
Live CPI, SPI, PV, EV, and AC built from verified field data. Budget and schedule performance visible in real time - not reconstructed from guesses.
Time Tracking + DHA
GPS-tagged clock in/out. Daily hazard acknowledgment integrated at clock-in. Automated reminders for unsubmitted entries. Payroll-ready exports.
Compaction + Pressure Tests
Structured forms with photos, signatures, and timestamps. Branded PDF delivery to inspectors automatically. Pass the first time - every time.
Fleet Management
Equipment registry, assignments, maintenance checklists, and emergency work orders. Know where everything is and when it was last serviced.
Procurement + Deliveries
Material delivery tracking with photos. Procurement requests. Vendor management. All linked to projects and costs in real time.
Client Portal
Read-only project access for owners and municipalities. Progress, inspection media, and deliverables visible without exposing internal data.
Field crews and leadership. Same system. Right data.
PM Axsus gives every role exactly what they need - no more, no less.
Fast tools built for the way you actually work.
- ✓Clock in with GPS - no paperwork, no calls to the office
- ✓Log compaction, pressure tests, and incidents from your phone on-site
- ✓Upload photos and reports with timestamps - proof captured automatically
- ✓Equipment checklists and maintenance flagged and tracked
- ✓Material deliveries logged before the truck leaves
Real earned value. Live from the field.
- ✓Live EVM dashboard - CPI, SPI, budget vs actual updated in real time
- ✓Inspection-ready reports built from verified field data - pass the first time
- ✓Approve time, manage procurement, and track change orders in one place
- ✓Client portal for transparent progress sharing without exposing internals
- ✓Decisions in minutes - not days - with data flowing direct from field
A 2-Day Proof of Value
We step into your operation and show you exactly where PM Axsus eliminates the gaps - before you commit to anything.
Field Reality Analysis
- Map how earned value is actually created on your sites today
- Identify where reconstruction is happening after the fact
- Baseline reporting latency, inspection pass rates, crew productivity
- Expose the gaps between what happened and what got recorded
Live Field Walkthrough
- Work directly with your foremen and crews on-site
- Replace reconstruction with real-time capture - live demonstration
- Show field-to-office synchronization in real time
- Align every role to the same system simultaneously
ROI Report Delivered
- Side-by-side: legacy process vs PM Axsus field capture
- Quantified: hours recovered, re-tests avoided, closeout speed
- Written ROI model showing exact payback timeline
- Executive summary for ownership decision
Six laws civil contractors live by.
One system built around them.
These aren't marketing lines. They're the field realities that built PM Axsus - and the problems it eliminates.
Your jobsite. Fully instrumented.
Three hardware systems that turn PM Axsus into the most accurate civil operations dataset in North America. Competitors can copy software. They can't copy ground truth.
Live Camera System
Every active project has eyes. A jobsite camera system mounted on equipment and across the site streams directly into your PM Axsus dashboard - so you see trench progress, crew activity, and equipment movement without making a call. Visual proof exists before anyone asks for it.
- Visual verification of work without leaving the office
- Proof of progress tied directly to project and equipment records
- Foundation for AI-driven production tracking and automated reporting
Axsus Edge Hub
One device manages every data stream on the site - cameras, sensors, and machine feeds - and keeps syncing to PM Axsus whether the connection is strong or gone. The civil construction IoT backbone that provisions itself, monitors itself, and recovers itself. You deploy it. It runs.
- Continuous field data capture with or without connectivity
- Every camera, sensor, and machine tied to one site record
- Zero manual configuration after deployment
Machine Intelligence
Machine intelligence for construction that reads real engine data and sends it directly into your project dashboard every few seconds. Engine hours, fuel burn, idle percentage, and location - all captured automatically with construction equipment tracking tied to the job it's working. No logbooks. No guessing. No lag.
- Real production hours tied to project progress automatically
- Idle time and fuel burn visible without asking the operator
- Machine data and field records in the same dashboard
One site. Cameras, sensors, and machine intelligence - all feeding PM Axsus in real time.
See it in action →The jobsite that sees itself.
PM Axsus is building toward a fully autonomous field intelligence layer. Two capabilities in active development that will change how civil projects are monitored, verified, and reported - permanently.
Computer Vision
PM Axsus cameras already give you eyes on every active site. Computer vision for construction will give those cameras a brain. Production progress, crew presence, equipment activity, and safety conditions - identified automatically from live footage and written directly into your project record. No one reviews the footage. The construction site AI does. The report already exists by the time you open the dashboard - automated jobsite reporting built from what actually happened.
- Manual progress verification from the office
- End-of-day production reports built from memory
- Inspection proof gathered after the fact
Drone Automation
Site surveys, progress mapping, and volume calculations from above - tied directly to the PM Axsus project record instead of living in a disconnected tool. Drone automation for civil contractors means flights become part of your standard field capture workflow. The aerial view and the ground record exist in the same system, telling the same story.
- Manual site surveys that take days to process
- Aerial data siloed in software no one else on the team uses
- Volume calculations done by hand from lagging measurements
PM Axsus is not building features. It is building the operating system that civil construction has never had.
Built in the field, not in a boardroom.
Tyler Eiland is a civil construction executive and software founder based in Meridian, Idaho. He is Managing Partner and General Manager of Axsus Civil Development Company and the creator of PM Axsus, a construction intelligence platform.
More about Tyler Eiland →
See PM Axsus in your operation.
30 minutes. We show you exactly how it works in civil construction - not a generic demo. We talk about your workflows, your system types, your pain points.
Book Your Demo
We'll reach out within one business day to confirm.
You're on the radar.
Check your email — we'll confirm your demo time within one business day.
Book on Calendly Now